3 April 2026 · Claire and Marc
Le Grenier has had a makeover

Stripped beams, oiled floorboards, new beds for the mezzanine: the family room is ready for the season.
This winter, while the house was closed, we did up Le Grenier from top to bottom. The roof beams were stripped one by one, and their oak has got its pale colour back. The floorboards were given several coats of oil, and the room still smells of fresh wood when you push the door open.
Marc set up the new beds in the mezzanine, under the slope of the roof, where the children sleep. The double bed is still on the main level, and the wooden staircase has not changed. Le Grenier takes up the top floor, up a stone staircase and then a wooden one: we would rather tell you beforehand. It is ready for the season, which starts in April.
Fancy a visit? Our rooms · Book a stay
More to read
- Les Prés, the quietest room 18 March 2026
- The garden is waking up 2 March 2026